Wattcraft-icon.png
 

PLASSER UK ENERGY ASSESSMENT

Wattcraft carried out an energy assessment at the Plasser UK site in Ealing. This plant undertakes the repair, overhaul and maintenance of trains used for the maintenance of railway tracks and houses a both workshop areas and offices.

 

Areas covered in the assessment were:

  • Reduction in heating costs through more efficient systems

  • More efficient lighting and staging of introduction of LEDs

  • Optimisation of electrical load in relation to rooftop solar photovoltaics (PV)s

  • Relationship between energy improvement measures and carbon reduction commitment (CRC) and energy management framework.

PLASSER UK ENERGY ASSESSMENT.jpg