Plasser UK Energy Assessment
Case Study
Wattcraft has been carrying out energy consultancy work for Plasser UK at its site in Ealing. This plant undertakes the repair, overhaul and maintenance of trains used for the maintenance of railway tracks and houses both workshop areas and offices.
The following areas have been addressed:
Reduction in heating costs through more efficient systems
More efficient lighting and staging of introduction of LEDs
Optimisation of electrical load in relation to rooftop solar photovoltaics (PV)
Relationship between energy improvement measures and carbon reduction commitment (CRC) and energy management framework
Energy procurement optimisation through investigation of variable tariff structure in connection with usage patterns
Contact Us
For more information regarding Wattcraft services or to discuss how we can help your business, please contact Rupert.
Email rupert.blackstone@wattcraft.com
Phone +44 (0)1453 706500
Alternatively please complete our form.